Alisa Cox
Dock Renovation Estimate

14649 Diamond Head N 560 sq ft Decking New Boat Lift $36,000.00 – $51,000.00

Parties

Customer

Alisa Cox

14649 Diamond Head N
Montgomery, Texas

Contractor

Jordan Marine Construction LLC

4950 Lazy Lane
Montgomery, TX 77316

Managing Partner: Chris Kick
1810 Eagles Cove, Friendswood, TX 77586

560 sq ft
Decking
130 LF
2×12 Skirt
New Lift
Galv. Runners
10 Lights
Surface Mount

Decking Material — Choose One

The 560 sq ft of decking is priced two ways. The rest of the scope — 2×12 skirt, new boat lift, and dock lights — totals $23,000.00 either way. Your material choice sets the project total.

Option A

Treated Lumber

Pressure-treated wood decking across the full 560 sq ft.

  • Decking (560 sq ft)$13,000.00
  • Skirt, lift & lights$23,000.00
Project Total $36,000.00
Option B

MoistureShield Composite

Low-maintenance composite decking across the full 560 sq ft, including the upgraded framing required for the composite install.

  • Decking + upgraded framing (560 sq ft)$28,000.00
  • Skirt, lift & lights$23,000.00
Project Total $51,000.00

Scope & Pricing

Itemized scope for the dock renovation. Item 1 (decking) shows both material prices; items 2–4 are the same regardless of the material chosen.

#DescriptionAmount
1 Decking Replacement — 560 sq ft Remove existing decking and install 560 sq ft of new decking. Material choice below — priced two ways. The MoistureShield price includes the upgraded framing required for the composite install. Treated $13,000.00
MoistureShield $28,000.00
2 2×12 Skirt — 130 Linear Feet Install 130 LF of single 2×12 skirt (eleven 12′ pieces) around the structure. $5,750.00
3 New Boat Lift — Complete Supply and install a complete new lift with galvanized runners and a raised motor. $13,000.00
4 Dock Lights — 10 Surface Mount Install ten (10) surface-mount dock lights. Power is close and marked on the drawing. $4,250.00
Base scope (items 2–4 — skirt, lift & lights) $23,000.00
Project Total — Option A (Treated) $36,000.00
Project Total — Option B (MoistureShield) $51,000.00

Questions About This Estimate?

Reach out to Jordan Marine Construction to discuss scope, material choice, or scheduling.