Parties
Joe Thompson
19954 Gemstone Dr
Montgomery, Texas 77356
United States
Jordan Marine Construction LLC
4950 Lazy Lane
Montgomery, Texas 77316
Managing Partner: Chris Kick
Scope of Work
Below is the full scope for this complete quote — demolition, bulkhead, and decking.
Demolition — Existing Dock & Poles
Demolish and remove existing 8×10 dock and two (2) poles.
Included in contract total below.
Wood Bulkhead — 86′ with Tie-Backs
Eighty-six feet (86′) of wood bulkhead with new tie-backs driven in front of existing structure. Thirty-one feet (31′) of the run is under the existing boathouse.
Quote: $61,000.00
Boathouse Decking — MoistureShield
Remove existing treated decking on the boathouse and replace with MoistureShield decking.
Quote: $32,000.00
Itemized quote
Itemized scope and pricing for this complete quote.
| # | Description | Amount |
|---|---|---|
| 1 | Demolition — Existing Dock & Poles Demolish and remove existing 8×10 dock and two (2) poles. | Included |
| 2 | Wood Bulkhead — 86′ with Tie-Backs Eighty-six feet (86′) of wood bulkhead with new tie-backs driven in front of existing structure. Thirty-one feet (31′) of the run is under the existing boathouse. | $61,000.00 |
| 3 | Boathouse Decking — MoistureShield Remove existing treated decking on the boathouse and replace with MoistureShield decking. | $32,000.00 |
| Total | $93,000.00 | |
| This is the entire and complete quote for the scope above. Payment schedule to be confirmed in the executed contract. | ||
Payment
Payment schedule, deposits, and milestones will be agreed in the formal contract. Contact Jordan Marine Construction to proceed or schedule work.
This quote is the complete scope and pricing shown on this page. It is not a binding contract until executed by both parties.
Questions About This Quote?
Reach out to Jordan Marine Construction to discuss this quote or schedule next steps.